Site 9
Site Location: Section 35; T-27s; R-3w
Eastern stream body between sections 35 and 2 on 
the north side of the road.
Elevation: 1496 ft GPS Location: N- 37 Degrees 38.923'
W-097 Degrees 36.872'
Date of testing Water Temp. - (Celsius) Water Temp. - (Fahrenheit) Flow Rate - (ft/s) pH Turbidity - (ntu) Dissolved Oxygen - (ppm) Conductivity - (uS/cm) Total Dissolved Solids - (ppm) Ammonia (as nitrogen) - (ppm) Nitrate (as nitrogen) - (ppm) Phosphate - (ppm)
27-Feb-02 -0.35 31.37   8.28 95 9.38 3.82 1.93 1.23 0.19 0
19-Mar-02 8.1 46.58 0.00 7.84 5.7 7.31 183.9 91.9 0.12 0.08 0
12-Apr-02 13 55.4 0.00 7.8 3.6 6.24 66.4 33.2 0.37 0.07 0.03
30-Apr-02 20.05 68.09 0.00   5.3 3.82 2.86 1.45 0.54 0.07 0.12
21-May-02 19.95 67.91 0.00 8 19 7.97 2420 1160 0.69 0.08 0.09
11-Jun-02 24.1 75.38 0.00 7.6 27 4.03 854 428 21.8 0.12 0.21
2-Jul-02 23.55 74.39 0.00 7.8 6.8 5.73 1170 586 0.95 0.12 0.22
23-Jul-02                      
14-Aug-02 20.35 68.63 0.63 7.1 500 5.31 174.3 87.4 0.24 1.1 0
4-Sep-02 24.25 75.65 0.00 7.5 160 2.71 2220 1070 0.6 0.1 0.65
25-Sep-02                      
16-Oct-02 10.25 50.45 0.00 7.3 50 5.45 141 70.4 0.28 0.27 0
6-Nov-02 9.5 49.1 0.00 7.3 220 7.24 980 483 1.51 1.66 0.28
26-Nov-02 2.75 36.95 0.00 7.2 26 6.07 1135 574 0.25 0.17 0.37
19-Dec-02 6.25 43.25 0.00 7.3 15 9.56 857 430 0.4 0.15 0.2
9-Jan-03 4 39.2 0.01 7.9 12 12.5 947 471 0.5 0.18 0.09
30-Jan-03 4 39.2 0.01 7.5 3.7 12.28 1007 503 0.96 0.16 0.02
   = Unable to test    = Equipment failure
 
 
   
   
   
   
   
   
   
   
Comments:
Date: 27 Feb 02
It was cloudy and the water had a thin layer of ice.  Flow not tested due to equipment failure.
Date: 19 Mar 02
It was foggy and drizzling.  There was a high level of plant material in the water at the site.
Date: 12 Apr 02
It was cloudy.
Date: 30 Apr 02
It was cloudy.  There was a high level of dying plant life in the water.  pH was not tested due to equipment failure.
Date: 21 May 02
It was sunny.
Date: 11 Jun 02
It was cloudy and thunder could be heard in the distance.
Date: 2 July 02
It was cloudy.  The bridge has been silted in from the stream to the north.
Date: 23 July 02
It was partly cloudy.  Unable to test, site was dry.  There was standing water to the south, unable to obtain.
Date: 14 Aug 02
It was sunny and clear.
Date: 4 Sep 02
It was sunny.
Date: 25 Sep 02
It was sunny and clear.  Unable to test, site was dry.
Date: 16 Oct 02
It was cloudy.
Date: 6 Nov 02
It was sunny and clear.
Date: 26 Nov 02
It was sunny.  There was a thin of ice covering the test site.
Date: 19 Dec 02
It was sunny.
Date: 9 Jan 03
It was sunny and windy.
Date: 30 Jan 03
It was sunny.  Had to break ice over the site to test.