Consultant Information & CAD Standards
![]()
Autodesk Viewer required
to view map.
These files are provided as a service for consultants developing plans to Sedgwick County Public Works requirements.
The standards may or may not be updated using the latest version of AutoCAD software. Any compatibility issues will be the responsibility of the downloading party.
Ensure that the file “SCPW Standards Instructions” is downloaded and reviewed for proper usage of these drawings.
Questions may be directed to pwplans@sedgwick.gov.
It is suggested these files be placed under a common folder named “County Standards”.
Sedgwick County Public Works Standards Instructions and Descriptions
Support files
Copy these files to your AutoCAD “Support” folder, and apply in the plot dialogue.
-
scpwmono.ctb - Sedgwick County color table file for pen sizes (full-size plot)
-
scpwmono-half.ctb - Sedgwick County color table file for pen sizes (half-size plot)
You may copy the following files to any folder you like. It is suggested the files be kept together, so when updates are made by Sedgwick County, you can replace them easily.
| Name | Revised | Download | |
|---|---|---|---|
|
Sedgwick County Titlesheet |
DWG | ||
The website provides .pdf files to show what the lineweights on your final plots should be like.
Bridge Standards
| Name | Revised | Download | |
|---|---|---|---|
|
Bridge Project Marker-large Large project marker for bridges |
2/26/10 |
||
|
Bridge Project Marker-small Small project marker for bridges |
2/26/10 |
||
Pavement Marking Standards
|
Name |
Revised |
Download |
|
|---|---|---|---|
|
PM-1: Two-Lane Roadways |
2/26/10 |
||
|
PM-2: Multi-Lane Roadways |
2/26/10 |
||
|
PM-3: Multi-lane Roadways with Curb and Gutter |
2/26/10 |
||
|
PM-4: Marking on Concrete Bridge Decks |
2/26/10 |
||
|
PM-5: Marking on Bridge Decks (Methyl Methacrylate) |
2/26/10 |
||
|
PM-6: At-Grade Railroad Crossing |
2/26/10 |
||
Traffic Control Standards
|
Name |
Revised |
Download |
|
|---|---|---|---|
|
TC-1: Traffic Control Signs and Channelization |
2/26/10 |
||
|
TC-2: Traffic Control Barricades |
2/26/10 |
||
|
TC-3: Blank Traffic Control for special areas |
2/26/10 |
||
|
TC-4: Construction Work at Off Shoulder Locations (two & four lane) |
2/26/10 |
||
|
TC-5: One Lane Closed on Two-Lane Roadway (Flagger) |
2/26/10 |
||
|
TC-6: One Lane Closed on Two-Lane Roadway (Pilot Car) |
2/26/10 |
||
|
TC-7: Moving Work Area on Two-Lane Roadway (Flaggers) |
2/26/10 |
||
|
TC-8: Moving Work Area on Two-Lane Roadway (Pilot Car) |
2/26/10 |
||
|
TC-9: One Lane Closed on Two-Lane Roadway (Signals) |
2/26/10 |
||
|
TC-10: One Lane Closed on Four Lane Roadway |
2/26/10 |
||
|
TC-11: One-Half Roadway Closed on Four Lane Undivided Roadway |
2/26/10 |
||
|
TC-12: One Lane Closed on Four Lane Divided Roadway |
2/26/10 |
||
|
TC-13: Center Lanes Closed on Four Lane Undivided Roadway |
2/26/10 |
||
|
TC-14: One Roadway Closed on Four-Lane Divided Roadway |
2/26/10 |
||
|
TC-15: Railroad Crossing Closure |
2/26/10 |
||
|
TC-16: Summary of Traffic Control Devices |
2/26/10 |
||
Sign Details
|
Name |
Revised |
Download |
|
|---|---|---|---|
|
TE-1: Traffic Sign Installation Details |
2/26/10 |
||
|
TE-2: Street Name Sign Installation Details |
2/26/10 |
||
|
TE-3: Object Marker Installation Details |
2/26/10 |
||
Signalization
|
Name |
Revised |
Download |
|
|---|---|---|---|
|
TS-1 thru 6: Traffic Signal Installation Details |
2/26/10 |
||
Miscellaneous
|
Name |
Revised |
Download |
|
|---|---|---|---|
|
Entrance Details |
2/26/10 |
||
